|
South Pond
Posted: Monday,
November 16, 2009
You may have noticed that the final touches were made on the south pond. The
rocks have been cleaned off and over 800 yards of silt was removed from the south
pond. The Board would like to thank Bill and Sandra Kenney for their help. They
saved the Association over $5,000 in additional costs.
This spring we will be installing breaks in between the bridge and Hook road.
Hopefully, this will encourage the silt to settle in a much easier location
to remove.
This message was approved
by the MVPOA Board |